The dividing curtain construction, demountable
The dividing curtain construction, demountable, manual slided with steel rope
The dividing curtain construction, demountable, manual slided with steel rope
The construction of the demountable curtain, mounted on a steel cord, allows the separation of the gym in any place when it is impossible to install the curtain raised up or sliding - mounted on the ceiling.
The curtain material can be a net, cotton fabric or a combination of net and curtain fabric. After releasing the crank tension lock, loosen the curtain tension, the cable drops until it can be unhooked from one side of the curtain. The curtain is installed in the reverse order. The material is slid to the side on a steel cord.
The structure is composed of: ratchet crank drive (safe tension of the curtain), construction steel hook - mounted on the opposite side to the wall, intermediate posts made of 40x40mm profile, stretched steel cable between the crank drive and hook on the wall and possibly between intermediate posts, steel net holders links for attaching mesh or curtain material to the structure.
There is a possibility of tensioning the cable between the posts embedded in the sockets, in the case of fencing part of the sports hall without contact with the bearing wall.
Construction posts painted according to RAL palettes
The net or curtain material that is part of the curtain is not included in the construction set.
Data sheet
- Composition
- Steel
- Finish
- Powder coating
- Unit
- set
- Colour
- RAL palett
- Destiny
- Indoor
- Production time
- up to 3 weeks
- Availability
- on the order
- Characteristics
- cranck tension, demountable